{"id":19559,"date":"2022-04-09T00:04:25","date_gmt":"2022-04-09T04:04:25","guid":{"rendered":"https:\/\/autosector.com\/?p=19559"},"modified":"2022-04-09T00:04:25","modified_gmt":"2022-04-09T04:04:25","slug":"nissan-prototype-production-facility-solid-state-batteries","status":"publish","type":"post","link":"http:\/\/autosector.com\/?p=19559","title":{"rendered":"Nissan Unveils Prototype Production Facility For Solid-State Batteries"},"content":{"rendered":"<p>Nissan unveiled today its prototype production facility for laminated all-solid-state battery (ASSB) cells. The facility is located within the Nissan Research Center in Kanagawa Prefecture, Japan.<\/p>\n<p>The Japanese company <a href=\"https:\/\/insideevs.com\/news\/551144\/nissan-proprietary-solid-state-batteries\/\">announced in-house development of solid-state batteries in November 2021<\/a> with a plan to start pilot production at its Yokohama Plant in fiscal 2024 and launch the first EV powered by the new batteries by fiscal 2028.<\/p>\n<p>The prototype production line is a major step toward commercialization of those next-generation batteries, which according to Nissan, are expected to offer an energy density approximately twice that of conventional lithium-ion batteries, significantly shorter charging time due to superior charge\/discharge performance, and lower cost thanks to the opportunity of using less expensive materials.<\/p>\n<p><a href=\"https:\/\/insideevs.com\/nissan\/\">Nissan<\/a>\u00a0has engaged in lithium-ion battery development for a very long time (over 20 years) and, as we understand, the company intends to continue its in-house approach also with the solid-state batteries.<\/p>\n<p>As we can see, the physical form factor is similar to conventional cells currently used by the company &#8211; laminated cells.<\/p>\n<section contenteditable=\"false\" data-widget=\"mosaic\" data-type=\"2\" data-align=\"none\" data-size=\"100\">\n<section contenteditable=\"false\" draggable=\"true\" data-widget=\"image\" data-border=\"\" data-id=\"6574130\" data-title=\"\"><picture loading=\"lazy\"><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp\" type=\"image\/webp\" media=\"(min-width: 1025px)\"\/><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 1x, https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s2\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 2x\" type=\"image\/webp\"\/><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg\" type=\"image\/jpeg\" media=\"(min-width: 1025px)\"\/><img decoding=\"async\" draggable=\"false\" src=\"https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg\" alt=\"Nissan Prototype Production Facility For All-Solid-State Batteries\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 1x, https:\/\/cdn.motor1.com\/images\/mgl\/7ZLONA\/s2\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 2x\" width=\"16\" height=\"9\"\/> <\/picture><\/section>\n<section contenteditable=\"false\" draggable=\"true\" data-widget=\"image\" data-border=\"\" data-id=\"6574145\" data-title=\"\"><picture loading=\"lazy\"><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s3\/nissan-prototype-all-solid-state-battery-cell.webp\" type=\"image\/webp\" media=\"(min-width: 1025px)\"\/><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s3\/nissan-prototype-all-solid-state-battery-cell.webp 1x, https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s2\/nissan-prototype-all-solid-state-battery-cell.webp 2x\" type=\"image\/webp\"\/><source srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s3\/nissan-prototype-all-solid-state-battery-cell.jpg\" type=\"image\/jpeg\" media=\"(min-width: 1025px)\"\/><img decoding=\"async\" draggable=\"false\" src=\"https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s3\/nissan-prototype-all-solid-state-battery-cell.jpg\" alt=\"Nissan Prototype All-Solid-State Battery Cell\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s3\/nissan-prototype-all-solid-state-battery-cell.jpg 1x, https:\/\/cdn.motor1.com\/images\/mgl\/y2gEXK\/s2\/nissan-prototype-all-solid-state-battery-cell.jpg 2x\" width=\"16\" height=\"9\"\/> <\/picture><\/section>\n<\/section>\n<p>By the way of presenting the prototype production facility, Nissan has repeated its very ambitious targets to achieve a cost of $75 per kWh in fiscal 2028 and $65 per kWh thereafter (on the pack level).<\/p>\n<p>In effect, electric vehicle costs should be reduced to the same level as gasoline-powered vehicles, Nissan explains.<\/p>\n<section contenteditable=\"false\" draggable=\"true\" data-widget=\"video\" data-url-params=\"\"><img decoding=\"async\" class=\"sizer\" draggable=\"false\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAABAAAAAJCAYAAAA7KqwyAAAAGXRFWHRTb2Z0d2FyZQBBZG9iZSBJbWFnZVJlYWR5ccllPAAAABpJREFUeNpi\/P\/\/PwMlgImBQjBqwLAwACDAAOVfAw9\/ZDvcAAAAAElFTkSuQmCC\" alt=\"\"\/> <\/p>\n<p><iframe width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"\" data-src=\"https:\/\/www.youtube.com\/embed\/Ax81rJTP8xE\" data-src-param=\"\">[embedded content]<\/iframe><\/p>\n<\/section>\n<p>Kunio Nakaguro, executive vice president in charge of R&amp;D, said:<\/p>\n<blockquote readability=\"15\">\n<p>&#8220;Nissan has been a leader in electrification technology through a wide range of R&amp;D activities, from molecular-level battery material research to the development of safe, high-performance EVs. Our initiatives even include city development using EVs as storage batteries.<\/p>\n<p>\u201cThe knowledge gained from our experience supports the development of all-solid-state batteries and we\u2019ve accumulated important elemental technologies. Going forward, our R&amp;D and manufacturing divisions will continue to work together to utilize this prototype production facility and accelerate the practical application of all-solid-state batteries.&#8221;<\/p>\n<\/blockquote>\n<div itemscope=\"\" itemtype=\"https:\/\/schema.org\/ImageGallery\" class=\"msnt-photo-thumb-gallery inline \"> <meta itemprop=\"name\" content=\"Nissan Prototype Production Facility For All-Solid-State Batteries\"\/> <meta itemprop=\"thumbnailUrl\" content=\"\"\/> <\/p>\n<div class=\"msnt-photo-thumb-gallery-main-photo\"> <a href=\"\/photo\/6574124\/nissan-prototype-production-facility-for-all-solid-state-batteries\/\" class=\"msnt-photo-thumb-gallery-main-photo-box\"> <picture><source type=\"image\/webp\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 1x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 2x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 3x\" media=\"(min-width: 768px)\"><source type=\"image\/jpeg\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 1x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 2x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s3\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 3x\" media=\"(min-width: 768px)\"><source type=\"image\/webp\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s6\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 1x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 2x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.webp 3x\" media=\"(min-width: 320px)\"><source type=\"image\/jpeg\" srcset=\"https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s6\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 1x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 2x, https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg 3x\" media=\"(min-width: 320px)\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.motor1.com\/images\/mgl\/KbJNxQ\/s4\/nissan-prototype-production-facility-for-all-solid-state-batteries.jpg\" loading=\"lazy\" alt=\"Nissan Prototype Production Facility For All-Solid-State Batteries\" width=\"16\" height=\"9\"\/> <\/source><\/source><\/source><\/source><\/picture> <\/a> <\/p>\n<p><span class=\"value\">33<\/span> <span class=\"label\">Photos<\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<p><strong>Nissan battery technology targets in brief:<\/strong><\/p>\n<ul>\n<li>Nissan intends to introduce cobalt-free lithium-ion batteries to bring down the cost by 65% by fiscal year 2028 (by the end of March 2029)<\/li>\n<li>Nissan intends to launch electric vehicle with <em>&#8220;its proprietary all-solid-state batteries (ASSB)&#8221;<\/em> by fiscal year 2028 (by the end of March 2029)<br \/>a pilot plant in Yokohama should be ready as early as fiscal year 2024<\/li>\n<li>all-solid-state batteries (ASSB) target cost:<br \/>$75 per kWh on the pack level by fiscal year 2028<br \/>potential to achieve $65\/kWh on the pack level<\/li>\n<li>global battery supply targets:<br \/>52 GWh by by fiscal year 2026 (by the end of March 2027)<br \/>130 GWh by fiscal year 2030 (by the end of March 2031)<\/li>\n<li>EV36Zero (EV hub concept) fully integrated manufacturing to spread globally: Europe (UK), Japan, China and in the U.S.<\/li>\n<\/ul>\n<section class=\"relatedContent-new\" contenteditable=\"false\" draggable=\"true\" data-widget=\"related-content\" data-widget-size=\"content\" data-params=\"%7B%22type_id%22%3A0%2C%22title_id%22%3A%22%22%2C%22items%22%3A%5B%7B%22article_edition_id%22%3A%22577505%22%2C%22title%22%3A%22US%3A%20Nissan%20LEAF%20Sales%20Cruise%20Above%204%2C000%20In%20Q1%202022%22%2C%22alias%22%3A%22us-nissan-leaf-sales-2022q1%22%2C%22section%22%3A%221%22%2C%22is_video%22%3A%220%22%2C%22images%22%3A%7B%22s5%22%3A%22https%3A%2F%2Fcdn.motor1.com%2Fimages%2Fmgl%2FW81O8L%2Fs5%2Fnissan-leaf.jpg%22%7D%7D%2C%7B%22article_edition_id%22%3A%22578035%22%2C%22title%22%3A%22Nissan%20Delays%20All-Electric%20Ariya%20SUV%20Yet%20Again%2C%20Supply%20Chain%20Issues%22%2C%22alias%22%3A%22nissan-ariya-delayed-again-chip-shortage%22%2C%22section%22%3A%221%22%2C%22is_video%22%3A%220%22%2C%22images%22%3A%7B%22s5%22%3A%22https%3A%2F%2Fcdn.motor1.com%2Fimages%2Fmgl%2FQpR88%2Fs5%2F2021-nissan-ariya.jpg%22%7D%7D%5D%7D\">   <\/section>\n","protected":false},"excerpt":{"rendered":"<p>Nissan unveiled today its prototype production facility for laminated all-solid-state battery (ASSB) cells. The facility is located within the Nissan Research Center in Kanagawa Prefecture, Japan. The Japanese company announced in-house development of solid-state batteries in November 2021 with a plan to start pilot production at its Yokohama Plant in fiscal 2024 and launch the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19560,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[4],"tags":[],"class_list":["post-19559","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-e-cars"],"_links":{"self":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/19559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19559"}],"version-history":[{"count":0,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/19559\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/media\/19560"}],"wp:attachment":[{"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19559"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}