{"id":36883,"date":"2022-11-25T10:18:43","date_gmt":"2022-11-25T15:18:43","guid":{"rendered":"http:\/\/autosector.com\/?p=36883"},"modified":"2022-11-25T10:18:43","modified_gmt":"2022-11-25T15:18:43","slug":"frances-first-offshore-wind-farm-is-now-fully-online","status":"publish","type":"post","link":"http:\/\/autosector.com\/?p=36883","title":{"rendered":"France&#8217;s first offshore wind farm is now fully online"},"content":{"rendered":"<figure class=\"img-border featured-image\">\n\t\t<img fetchpriority=\"high\" decoding=\"async\" class=\"skip-lazy\" src=\"https:\/\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?quality=82&amp;strip=all&amp;w=1600\" srcset=\"https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=320&amp;quality=82&amp;strip=all&amp;ssl=1 320w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=640&amp;quality=82&amp;strip=all&amp;ssl=1 640w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=1024&amp;quality=82&amp;strip=all&amp;ssl=1 1024w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=1500&amp;quality=82&amp;strip=all&amp;ssl=1 1500w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=2000&amp;quality=82&amp;strip=all&amp;ssl=1 2000w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2022\/11\/France-first-offshore-wind-farm.jpg?w=2500&amp;quality=82&amp;strip=all&amp;ssl=1 2500w\" width=\"1600\" height=\"889\" alt=\"France first offshore wind farm\" fetchpriority=\"high\"\/><br \/>\n\t<\/figure>\n<p>France\u2019s first commercial-scale offshore wind project, the 480 megawatt (MW) Saint-Nazaire Offshore Wind Farm, is now fully up and running.<\/p>\n<p><span id=\"more-268302\"\/><ins class=\"adsbygoogle author_ad ad-container adsbygoogle author_ad hide-lg author-in-content\" data-ad-host=\"ca-host-pub-5506057612223327\" data-ad-client=\"ca-pub-9817249230503449\" data-ad-format=\"auto\"\/><\/p>\n<p>Eolien Maritime France (EMF), a consortium of EDF Renewables, Enbridge, and the Canada Pension Plan Investment Board, developed and owns the Saint-Nazaire offshore wind farm.<\/p>\n<p>As <em>Electrek<\/em> <a href=\"https:\/\/electrek.co\/2022\/09\/07\/france-first-offshore-wind-farm-installed\/\" target=\"_blank\" rel=\"noreferrer noopener\">previously reported<\/a>, installation of all 80 GE Haliade 150-6 MW offshore wind turbines were completed in September.<\/p>\n<p>France\u2019s first wind farm, which is off the southwestern coast of France, will produce the equivalent of 20% of the department of Loire-Atlantique\u2019s annual electricity consumption. It will supply the equivalent of enough electricity for 700,000 people annually.<\/p>\n<p>The wind farm first produced electricity at the beginning of June, and its turbines were gradually connected to the grid. Around 100 people will continue employment in La Turballe to operate and main the wind farm. Around 2,300 people worked on the offshore wind farm during the construction phase.<\/p>\n<p>Bruno Bensasson,\u00a0chairman and CEO of EDF Renewables, said:<\/p>\n<blockquote class=\"wp-block-quote\" readability=\"11\">\n<p>This first wind farm is part of the EDF Group\u2019s strategy to double its net capacity of global renewable energy to reach 60 GW in 2030. We are also participating in the National Low-Carbon Strategy of the government, which aims to achieve carbon neutrality by 2050 through energy conservation, nuclear power, and the acceleration of renewables.<\/p>\n<\/blockquote>\n<p><strong>Read more:<\/strong> <a href=\"https:\/\/electrek.co\/2022\/09\/07\/france-first-offshore-wind-farm-installed\/\" target=\"_blank\" rel=\"noreferrer noopener\">Final turbine installed on France\u2019s first offshore wind farm, with Macron pushing hard on renewables<\/a><\/p>\n<p>The French government aims to generate 32% of its energy from renewable sources by 2030.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n<p><em>UnderstandSolar is a free service that links you to top-rated solar installers in your region for personalized solar estimates. Tesla now offers price matching, so it\u2019s important to shop for the best quotes.\u00a0<a href=\"https:\/\/understandsolarenergy.com\/form\/?lsid=511&amp;s1=%7Bs1%7D#step1\" target=\"_blank\" rel=\"noreferrer noopener\">Click here to learn more and get your quotes<\/a>. \u2014 *ad<\/em>.\u00a0<\/p>\n<div class=\"ad-disclaimer-container\" readability=\"6.3518518518519\">\n<p class=\"disclaimer-affiliate\"><em>FTC: We use income earning auto affiliate links.<\/em> <a href=\"https:\/\/electrek.co\/about\/#affiliate\">More.<\/a><\/p>\n<p><a href=\"https:\/\/bit.ly\/3t9kf2a\"><img decoding=\"async\" class=\"aligncenter wp-image-846591 size-full\" src=\"https:\/\/Electrek.co\/wp-content\/uploads\/sites\/6\/2022\/11\/CARBO-Electrek-Ad.gif\" alt=\"\" width=\"750\" height=\"150\"\/><\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>France\u2019s first commercial-scale offshore wind project, the 480 megawatt (MW) Saint-Nazaire Offshore Wind Farm, is now fully up and running. Eolien Maritime France (EMF), a consortium of EDF Renewables, Enbridge, and the Canada Pension Plan Investment Board, developed and owns the Saint-Nazaire offshore wind farm. As Electrek previously reported, installation of all 80 GE Haliade [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8313,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[4],"tags":[],"class_list":["post-36883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-e-cars"],"_links":{"self":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/36883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36883"}],"version-history":[{"count":0,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/36883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/media\/8313"}],"wp:attachment":[{"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=36883"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=36883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}