{"id":74995,"date":"2024-07-29T15:36:19","date_gmt":"2024-07-29T19:36:19","guid":{"rendered":"https:\/\/autosector.com\/?p=74995"},"modified":"2024-07-29T15:36:19","modified_gmt":"2024-07-29T19:36:19","slug":"maryland-offshore-wind-farm-us-wind","status":"publish","type":"post","link":"http:\/\/autosector.com\/?p=74995","title":{"rendered":"A 2.2 GW Maryland offshore wind farm just took a big leap forward"},"content":{"rendered":"<figure class=\"img-border featured-image\">\n\t<img fetchpriority=\"high\" width=\"1500\" height=\"1000\" src=\"https:\/\/electrek.co\/wp-content\/uploads\/sites\/3\/2024\/07\/pexels-photo-213798.jpeg?quality=82&amp;strip=all&amp;w=1500\" class=\"skip-lazy wp-post-image\" alt=\"Maryland offshore wind\" srcset=\"https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2024\/07\/pexels-photo-213798.jpeg?w=320&amp;quality=82&amp;strip=all&amp;ssl=1 320w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2024\/07\/pexels-photo-213798.jpeg?w=640&amp;quality=82&amp;strip=all&amp;ssl=1 640w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2024\/07\/pexels-photo-213798.jpeg?w=1024&amp;quality=82&amp;strip=all&amp;ssl=1 1024w, https:\/\/i0.wp.com\/electrek.co\/wp-content\/uploads\/sites\/3\/2024\/07\/pexels-photo-213798.jpeg?w=1500&amp;quality=82&amp;strip=all&amp;ssl=1 1500w\" decoding=\"async\" fetchpriority=\"high\"\/><figcaption>\n\t\t\t\tPhoto Collections on <a href=\"https:\/\/www.pexels.com\/photo\/blades-conservation-ecology-efficiency-213798\/\" rel=\"nofollow\">Pexels.com<\/a>\t\t\t<\/figcaption><\/figure>\n<p><a href=\"https:\/\/uswindinc.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">US Wind<\/a>, a proposed 2.2 gigawatt (GW) Maryland offshore wind farm, just took a major step toward securing all of its federal permits by the end of 2024.<\/p>\n<p><span id=\"more-373718\"\/><\/p>\n<p>The Bureau of Ocean Energy Management (BOEM) today\u00a0released\u00a0US Wind\u2019s Final Environmental Impact Statement (FEIS), clearing another hurdle for the project\u2019s developers, Italy\u2019s renewable energy developer Renexia, to build up to 114 turbines totaling 2,200 megawatts (MW) capacity, enough to power 770,000 homes with clean energy. <\/p>\n<p>Jeff Grybowski, US Wind\u2019s CEO, said in an emailed statement, \u201cWe are now one step closer to securing all of our federal permits by the end of this year, and look forward to the day we can get steel in the water.\u201d<\/p>\n<p>US Wind\u2019s lease area is approximately 10 miles off the Maryland coast and approximately 10.4 miles off Sussex County, Delaware, at its closest points to shore. The project includes three planned phases and two of those phases, MarWin and Momentum Wind, have received offshore renewable energy certificates from the State of Maryland. \u00a0<\/p>\n<p>US Wind\u2019s proposal also includes up to four offshore substation platforms, one meteorological tower, and up to four corridors for offshore export cables that would make landfall in Delaware Seashore State Park. <\/p>\n<p>The development and construction phases of the project could potentially support an estimated 2,679 jobs annually over seven years.<\/p>\n<p>US Wind has been awarded offtake agreements with the state of Maryland and will re-engage the state\u2019s public utility board to restructure those agreements in the fall. <\/p>\n<p>As part of the project, US Wind advanced plans to build Sparrows Point Steel, an offshore wind turbine foundation facility in Baltimore Harbor, which, when fully operational, would employ more than 500 people, including hundreds of unionized steelworkers.<\/p>\n<p>\u00a0Liz Burdock, president and CEO at Oceantic Network, said in an emailed statement:<\/p>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\" readability=\"12\">\n<p>Along with US Wind\u2019s direct investment in Sparrows Point Steel, this offshore wind project will contribute to new, well-paying jobs across Maryland and throughout the supply chain. <\/p>\n<p>While more projects are needed to meet Maryland\u2019s offshore wind energy targets, today\u2019s action is an important step forward to deliberately advance another commercial scale offshore wind project. <\/p>\n<\/blockquote>\n<p>Once US Wind receives final approval to begin construction, the pipeline of approved projects during the Biden administration will exceed 15 GW. Currently, more than 5 GW of projects are under installation, and 300+ MW are online.<\/p>\n<p><strong>Read more:<\/strong> <a href=\"https:\/\/electrek.co\/2023\/11\/09\/worlds-largest-steel-mill-wind-turbine-factory\/\">The world\u2019s largest steel mill will get a second life as a wind turbine factory<\/a><\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n<p><em>If you live in an area that has frequent natural disaster events, and are interested in making your home more resilient to power outages, consider going solar and adding a battery storage system. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out <\/em><a href=\"https:\/\/www.energysage.com\/p\/electrek-rsm-ml\/\"><em>EnergySage<\/em><\/a><em>, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it\u2019s free to use and you won\u2019t get sales calls until you select an installer and share your phone number with them.<\/em><\/p>\n<p><em>Your personalized solar quotes are easy to compare online and you\u2019ll get access to unbiased Energy Advisers to help you every step of the way. Get started <\/em><a href=\"https:\/\/www.energysage.com\/p\/electrek-rsm-ml\/\"><em>here<\/em><\/a><em>. \u2013trusted affiliate link*<\/em><\/p>\n<div class=\"ad-disclaimer-container\" readability=\"6.3518518518519\">\n<p class=\"disclaimer-affiliate\"><em>FTC: We use income earning auto affiliate links.<\/em> <a href=\"https:\/\/electrek.co\/about\/#affiliate\">More.<\/a><\/p>\n<p><!-- post ad --><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Photo Collections on Pexels.com US Wind, a proposed 2.2 gigawatt (GW) Maryland offshore wind farm, just took a major step toward securing all of its federal permits by the end of 2024. The Bureau of Ocean Energy Management (BOEM) today\u00a0released\u00a0US Wind\u2019s Final Environmental Impact Statement (FEIS), clearing another hurdle for the project\u2019s developers, Italy\u2019s renewable [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8313,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[4],"tags":[],"class_list":["post-74995","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-e-cars"],"_links":{"self":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/74995","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=74995"}],"version-history":[{"count":0,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/posts\/74995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=\/wp\/v2\/media\/8313"}],"wp:attachment":[{"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=74995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=74995"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/autosector.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=74995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}